Pour concrete put up a wall.
Pouring concrete steps between walls.
Allow concrete to cure.
Finish the surface of the wall as desired.
Pour the retaining wall.
If steps are longer than 4 feet install stringers to support risers and keep stair lines straight.
He also checked that each step was perfectly level.
Shovel the concrete inside the forms starting with the bottom step and working up.
See below for more information on contraction joints remove forms and install waterproofing and drainage system.
Set riser boards to the marks and fasten them to the walls or side boards.
Create contraction joints every 4 6 feet.
I thought about drilling past the tile into the existing slab and putting rebar pins to hold it.
Follow the instructions on the bag of cement and mix accordingly.
When forming between walls or other flat surfaces such as plywood where you will be able to mark riser locations positioning risers is easy.
If that extra inch will cause the step to overhang the sidewalk place a strip of 1 2 in thick foam under the form to create a gap between the step and the sidewalk.
Available from diy stores and ready mix concrete companies these contain soluble emulsions that form a protective film when sprayed directly onto the surface of newly poured concrete slabs or walls.
Their idea was to dig a footing across the front and screw angle to the tile along the side wall and rear wall to keep the slab from settling.
Before pouring concrete steps coat the forms with a release agent.
When all the concrete was poured carlos began using a magnesium float to strike off the concrete to create a relatively smooth surface.
If the wall exceeds four feet in height footings should be poured separately.
Roll the wheelbarrow of cement over to your wooden forms and pour the cement into the footing and form area.
Once you have mixed the cement in the cement mixer dump it into the wheelbarrow.
Out from the old face of the step.
Tap the sides of the forms and risers with a hammer and jab a 2x4 up and down in the mix to drive air bubbles out.
After each wheelbarrow of concrete one of the guys would use a shovel to work the concrete around eliminating voids.
I had a company give me an estimate.
Build a concrete form to match the original height of the step.