We provide post tensioning cables that are utilized in commercial high rise buildings and parking structures.
Post tension cable installation.
The efficiency stems from being able to use high strength materials to structurally use the complete cross section to change the force and location of the reinforcing to best resist applied loads and to control the time when the we.
Post tensioning is a method of reinforcing strengthening concrete or other materials with high strength steel strands or bars typically referred to as tendons.
Our services range from barrier cable system installation to rehabilitation of concrete structures such as parking garages.
Our future vision pti envisions a future in which post tensioning is the first choice for reinforcing all structures.
In a post tensioned beam the tendons are stressed and each end is anchored to the concrete section aft.
Our record of success illustrates reliable installation of these systems in parking garages apartment buildings and other structures that require commercial post tensioning.
The alternative to pre tensioning is post tensioning.
Construction of post tensioned slabs on grade is very similar to using reinforcing steel except for the tensioning step.
We specialize in elevated and slab on grade post tensioning and post tension repair work for both commercial and residential applications in dallas fort worth arlington keller plano mansfield and throughout the dfw metroplex texas oklahoma colorado louisiana and new mexico.
Several methods exist for pre stressing concrete with post tensioning being a very common one.
Post tension services of texas ptst is a full service post tension company based in dallas.
Post tensioning is a greatly efficient system for structures that offers many benefits in a wide range of construction repair and rehabilitation applications.
Tendon systems is one of the only post tension cable companies with decades of experience and expertise.
Structural engineers recommend cumberland post tension because of their long standing knowledge and solid reputation in the industry.
Cables are arranged as indicated by the engineer and chaired to run through the center of the slab.